We power what can't fail

Energy Storage Solutions

Tekon 960 Impedance Battery Tester

SKU: BT11960

Designed to make technician’s field service maintenance effortless, the Tekon 960 can handle virtually all high-voltage battery systems.

Being an impedance meter allows the Tekon 960 to produce fast and accurate results that can be effortlessly transmitted to remote data holding locations using a mobile app while onsite.
All results are effectively recorded and stored, and there is no risk of lost data. Tekon 960 can offer service teams more efficiency and productiveness onsite saving thousands of dollars in downtime and HR expenses.

Price

+GST

Qty

Tekon 960 Impedance Battery Tester

Features

– Measures internal resistance on battery systems of up to 500V
– Measures voltages of battery systems of up to DC1000V
– Measures AC voltage of up to 600V (for UPS)
– Measures ripple voltage, current and temperature
– Diagnoses ageing batteries and predicts the life span based on historical data allowing the user to time the battery replacement
– Can store historical battery results in its 8MB memory
– Auto-hold and data storage
– Prints out measurements data in reports
– Transmits measurement data to remote locations (i.e. email, server) using Mobile App

Applications

Communications
UPS
Datacentres

Related Products

Frequently Asked Questions

What battery testing methods are recommended?

Three tiers. Impedance or conductance testing (instruments such as impedance meters) is fast, done on a live circuit, and reliably detects open cells, dry-out and connection degradation, but requires a baseline from when the bank…

Full answer: What battery testing methods are recommended?

Do I still need discharge testing if I have monitoring?

Yes, and this is where most monitoring vendors overclaim. Impedance and conductance are trend indicators, not capacity measurements. They catch open cells, dry-out and connection faults, and rising impedance correlates with capacity fade, but the…

Full answer: Do I still need discharge testing if I have monitoring?

What does AS 2676 require for battery maintenance and testing?

AS 2676 covers installation, maintenance, testing and replacement of secondary batteries in buildings, in two parts (vented and sealed cells). It is the standard Australian asset owners are audited against, and it is the correct…

Full answer: What does AS 2676 require for battery maintenance and testing?

How do I know when to replace a battery bank?

The usual convention is that a battery bank has reached end of life when it can deliver only 80% of its rated capacity. Below that point it can no longer be relied on to give…

Full answer: How do I know when to replace a battery bank?

How do I assess capacity on a single-bank zone substation where a discharge test is impractical?

This is the real problem. AusNet says full discharge and discharge-rate testing are “impractical on zone substations with a single battery bank”, which “prevent[s] accurate measurement of the DC system available capacity.” AusNet’s response is…

Full answer: How do I assess capacity on a single-bank zone substation where a discharge test is impractical?

More Sizing, testing and monitoring FAQs

Enquire Now

Login Required

An account is required to add products to your cart, please login or register for an account.