This is the real problem. AusNet says full discharge and discharge-rate testing are “impractical on zone substations with a single battery bank”, which “prevent[s] accurate measurement of the DC system available capacity.”
AusNet’s response is a new standard requiring:
- individual cell monitoring of voltage and impedance
- SCADA alarm monitoring
- research into estimating remaining useful life
Impedance monitoring is a trend indicator, not a capacity measurement. It reliably catches open cells, dry-out and connection problems, and it tracks capacity fade. But it does not replace a discharge test.
The only way to measure capacity directly is a second bank, or a portable load bank program.