Three tiers. Impedance or conductance testing (instruments such as impedance meters) is fast, done on a live circuit, and reliably detects open cells, dry-out and connection degradation, but requires a baseline from when the bank was new. Capacity analysers perform a cyclic load test and require the battery fully charged first. Timed discharge testing is the only direct measurement of capacity. AS 2676 covers installation, maintenance, testing and replacement obligations in Australia.