We power what can't fail

Energy Storage Solutions

Valen CCOLT 48V 100A Constant Current Load Tester

SKU: BT10006

Valen CCOLT 48V 100A constant current load tester for testing the performance and capacity of 48V battery systems.

The Valen CCOLT 48V 100A constant current load tester checks the real performance and capacity of 48V battery systems, such as telecom and UPS strings. You set the current, cut-off voltage and duration, and the CCOLT monitors voltage and elapsed time, disconnecting the load automatically at the cut-off. Test data can be downloaded for reporting, and a protective carry case is available for field use.

Price

+GST

Qty

Valen CCOLT 48V 100A Constant Current Load Tester

Features

Accurate The Valen Constant Current Load Tester (CCOLT) performs a full battery discharge test producing an accurate and absolute report on the performance of the battery under test Software Easy to use software allows for data and tests from the Valen CCOLT to be stored, exported to PDF or printed for the analysis of batteries Flexible Range Valen CCOLT can test an extensive range of capacities from 1A up to 100A discharge rates, or right up to 160A on the 12V version Test to the Fire Standard Valen CCOLT is the preferred battery tester for testing in accordance to fire standard AS1851.2012 Hard Protective Case A lightweight, lockable, protective carry case is also available to protect the Valen CCOLT

Applications

Specifications

Voltage48 V
SKUBT10006
Length260 mm
Width220 mm
Height270 mm
Capacity100
Box Quantity1
NATO Stock Number (NSN)Constant Current Load Tester (CCOLT) 48V 100A

Downloads

Related Products

Frequently Asked Questions

What battery testing methods are recommended?

Three tiers. Impedance or conductance testing (instruments such as impedance meters) is fast, done on a live circuit, and reliably detects open cells, dry-out and connection degradation, but requires a baseline from when the bank…

Full answer: What battery testing methods are recommended?

Do I still need discharge testing if I have monitoring?

Yes, and this is where most monitoring vendors overclaim. Impedance and conductance are trend indicators, not capacity measurements. They catch open cells, dry-out and connection faults, and rising impedance correlates with capacity fade, but the…

Full answer: Do I still need discharge testing if I have monitoring?

What does AS 2676 require for battery maintenance and testing?

AS 2676 covers installation, maintenance, testing and replacement of secondary batteries in buildings, in two parts (vented and sealed cells). It is the standard Australian asset owners are audited against, and it is the correct…

Full answer: What does AS 2676 require for battery maintenance and testing?

How do I know when to replace a battery bank?

The usual convention is that a battery bank has reached end of life when it can deliver only 80% of its rated capacity. Below that point it can no longer be relied on to give…

Full answer: How do I know when to replace a battery bank?

How do I assess capacity on a single-bank zone substation where a discharge test is impractical?

This is the real problem. AusNet says full discharge and discharge-rate testing are “impractical on zone substations with a single battery bank”, which “prevent[s] accurate measurement of the DC system available capacity.” AusNet’s response is…

Full answer: How do I assess capacity on a single-bank zone substation where a discharge test is impractical?

More Sizing, testing and monitoring FAQs

Enquire Now

Login Required

An account is required to add products to your cart, please login or register for an account.