Home / Component Range / Industrial Battery Testers / Battery Load Testers / Battery and Charger Analyser (BACA) 24V 25A
SKU: BT10002
Demonstrating that a battery has the capacity required for its intended application and deciphering the performance of a battery charger can be a time-consuming and tedious process.
The guesswork is taken away with these programmable Valen battery testers that can display results on an LCD screen or download graphic results for analysis. A printable report can be formatted with a customisable comments area and given to the end user.

| Voltage | 24 V |
|---|---|
| SKU | BT10002 |
| Length | 200 mm |
| Width | 140 mm |
| Height | 190 mm |
| Capacity | 25 |
| Box Quantity | 1 |
Three tiers. Impedance or conductance testing (instruments such as impedance meters) is fast, done on a live circuit, and reliably detects open cells, dry-out and connection degradation, but requires a baseline from when the bank…
Full answer: What battery testing methods are recommended?
Yes, and this is where most monitoring vendors overclaim. Impedance and conductance are trend indicators, not capacity measurements. They catch open cells, dry-out and connection faults, and rising impedance correlates with capacity fade, but the…
Full answer: Do I still need discharge testing if I have monitoring?
AS 2676 covers installation, maintenance, testing and replacement of secondary batteries in buildings, in two parts (vented and sealed cells). It is the standard Australian asset owners are audited against, and it is the correct…
Full answer: What does AS 2676 require for battery maintenance and testing?
The usual convention is that a battery bank has reached end of life when it can deliver only 80% of its rated capacity. Below that point it can no longer be relied on to give…
Full answer: How do I know when to replace a battery bank?
This is the real problem. AusNet says full discharge and discharge-rate testing are “impractical on zone substations with a single battery bank”, which “prevent[s] accurate measurement of the DC system available capacity.” AusNet’s response is…
Full answer: How do I assess capacity on a single-bank zone substation where a discharge test is impractical?
An account is required to add products to your cart, please login or register for an account.