Yes, and the framework is now reasonably settled after several years of reform. The key elements:

  • The AEMC’s distributor-led SAPS rules establish how a DNSP may replace a network connection with a stand-alone system while the customer retains the protections of a network customer.
  • The AER publishes guidance on the interaction between its ring-fencing guideline and distributor-led SAPS, and maintains the instruments applying to regulated SAPS.
  • AEMO maintains market frameworks including the Market Stand Alone Power System Resource Provider (MSRP) registration category for larger systems.

On the technical side, the design references most commonly applied are:

  • AS/NZS 4509.1 and 4509.2 for stand-alone power system safety, installation and design
  • AS/NZS 5033 for the PV array
  • AS/NZS 3000 as the base wiring standard
  • AS/NZS 5139 for battery system safety, where the installation falls within its scope That last qualification is important and widely misunderstood, see the next question.

Enquire Now

Login Required

An account is required to add products to your cart, please login or register for an account.